Three review links can mean three different things
A link that looks like an app is easy to mistake for a finished mobile product. Before approving a milestone, name the environment. The answer affects which behaviors you can review and which work is still ahead.
| Artifact | Useful for reviewing | Still needs separate evidence |
|---|---|---|
| Browser prototype | Flow, layout, wording and interactions in a browser | Native permissions, native modules and device behavior |
| Native development build | App behavior with its own native runtime and development tooling | Production configuration and release acceptance |
| Store-distributed build | The version delivered through the store or its testing channel | The specific backend, provider and operational checks in scope |
What a development build adds
Expo describes a development build as a native app configured for development. Unlike a fixed general-purpose preview app, it can contain the native code and configuration required by that project. A change to native dependencies or configuration may require a new native build.
For a review, ask for the platform, installation method and build identifier. Check the actual behaviors in scope on the agreed target: navigation, keyboard, permission prompts and any native feature the task depends on.
- Which native platforms and devices are covered?
- Does this build use mock, local, staging or production services?
- What happens if the API is unavailable?
- Which native changes require another build?
Read screenshots with their labels attached
LaClub’s member and host screens illustrate why a mobile review needs a clear user journey. Name the screen, the task and the build people will use to give feedback.
A separate browser prototype can still be useful for design review. It should be linked as a design reference, not used as a substitute for the native implementation or a release record.
A test list is not a test result
A test definition says what someone intends to check. A result should identify the build, environment, execution date, outcome and any blocked or skipped steps. Keep those details when sharing a pass count.
Keep a short review focused on what a person can do: open the app, find the task, complete it and understand the feedback. That makes the result useful to both the product owner and the developer.
A release is its own piece of work
Preparing a production build, distributing it for review and submitting it to a store are separate steps. Ownership of the developer accounts, signing configuration, store information and the release decision should be clear before the last milestone.
Do not assume that a successful native preview includes those tasks. Agree which build is the deliverable, who submits it, what providers must be checked and who looks after failures once people start using it.
Approve the artifact that matches the milestone
For a design milestone, a prototype and clear interaction notes may be enough. For an API-connected feature, ask for the working flow and its recorded checks in the agreed environment. For a release milestone, ask for the actual release artifacts and acceptance criteria.
That keeps a useful prototype useful, without asking it to prove something it was never meant to establish.
Further reading & related work
Product examples and references for the decisions in this note.